KG Q2 Sports Hall

  • Client: Argent
  • Architect: Bennetts Associates
  • Structural Engineer: Arup
  • M&E Engineer: E3 Consulting Engineers
  • Contractor: Kier
  • Location: King's Cross, London

Sturgis Carbon Profiling was commissioned by Argent to produce a Whole Life Carbon baseline study of the new Sports Hall at Kings Cross development and identify options to reduce the building’s carbon impacts.

SCP’s approach included:

Further details

The new community sports facility features a cross laminated timber (CLT) structure, an alternative to steel and concrete, with significantly lower carbon footprint and is lightweight – a fact that further reduces the embodied carbon of the project.

Currently on-site.